Vulnerable residents at risk from under-qualified workforce
![]() |
In August 2019, the Electrical Contractors’ Association responded to the government consultation following the Hackitt Report on fire safety in buildings. |
The safety of hospital patients, those in care and residents of high-rise buildings could still be at risk if those who work in higher-risk premises lack the necessary experience-based qualifications and competency – according to the Electrical Contractors Association (ECA).
In its response to the government’s ‘Building A Safer Future’ consultation, leading trade body ECA broadly agreed with the proposal for an ‘overarching competence framework’ for those who work on and in higher-risk buildings.
However, ECA also said the new framework must reinforce and extend experienced-based qualifications. Without doing so, ECA argues that electrical and other installations in higher risk residential buildings could pose an unacceptable risk of electrocution and fire.
In its response, ECA underlined that for a competence-based qualification system to ensure safety and quality in higher risk premises, all workers should undertake a suitable apprenticeship as a minimum. Alternative, comparable qualification routes should also be provided for existing experienced workers.
[edit] ECA Technical Director Mike Smith commented:
“ECA fully supports moves to ensure that those who work in higher-risk premises are suitably competent to do so, notably in the electrical and wider engineering services workforce.
“However, regulated competence-based qualifications, including apprenticeships, are fundamental to ensuring that installation and maintenance work delivers fire and electrical safety. Without this essential foundation, the residents of high-rise buildings and hospitals will remain at risk.”
ECA has also warned against the reliance, notably in the domestic consumer market, on short, classroom-based, courses which are being marketed as offering a fast track into competence.
Mike Smith added: “These short courses seriously undermine the take up of apprenticeships in the industry. Furthermore, their continued existence undermines calls from Dame Judith Hackitt and the government to ensure that the public is properly protected from fire risks in high rise buildings.”
[edit] About this article
This article was written by Omar Khalil, Communications Manager, ECA. It was published in August 2019 on the website of the Electrical Contractors’ Association (ECA) and can be accessed here.
[edit] Related articles on Designing Buildings Wiki
- Articles about electricity.
- Consumer electronics.
- Consumer unit.
- ECA articles.
- Electrical appliance.
- Electrical consumption.
- Electrical energy.
- Electrical equipment.
- Electrical installation.
- Electrical power.
- Electrical safety.
- Electrical system.
- Electrical wiring.
- Electrician.
- Electricity bill.
--ECA
Featured articles and news
Editor's broadbrush view on forms of electrical heating in context.
The pace of heating change; BSRIA market intelligence
Electric Dreams, Boiler Realities.
New President of ECA announced
Ruth Devine MBE becomes the 112th President of the Electrical Contractors Association.
New CIAT Professional Standards Competency Framework
Supercedes the 2019 Professional Standards Framework from 1 May 2025.
Difficult Sites: Architecture Against the Odds
Free exhibition at the RIBA Architecture Gallery until 31 May.
PPN 021: Payment Spot Checks in Public Sub-Contracts
Published following consultation and influence from ECA.
Designing Buildings reaches 20,000 articles
We take a look back at some of the stranger contributions.
Lessons learned from other industries.
The Buildings of the Malting Industry. Book review.
Conserving places with climate resilience in mind.
Combating burnout.
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.
Comments
110 volts instead of 240 volts would be a good start. As depicted by the photograph.