Vulnerable residents at risk from under-qualified workforce
|
| In August 2019, the Electrical Contractors’ Association responded to the government consultation following the Hackitt Report on fire safety in buildings. |
The safety of hospital patients, those in care and residents of high-rise buildings could still be at risk if those who work in higher-risk premises lack the necessary experience-based qualifications and competency – according to the Electrical Contractors Association (ECA).
In its response to the government’s ‘Building A Safer Future’ consultation, leading trade body ECA broadly agreed with the proposal for an ‘overarching competence framework’ for those who work on and in higher-risk buildings.
However, ECA also said the new framework must reinforce and extend experienced-based qualifications. Without doing so, ECA argues that electrical and other installations in higher risk residential buildings could pose an unacceptable risk of electrocution and fire.
In its response, ECA underlined that for a competence-based qualification system to ensure safety and quality in higher risk premises, all workers should undertake a suitable apprenticeship as a minimum. Alternative, comparable qualification routes should also be provided for existing experienced workers.
[edit] ECA Technical Director Mike Smith commented:
“ECA fully supports moves to ensure that those who work in higher-risk premises are suitably competent to do so, notably in the electrical and wider engineering services workforce.
“However, regulated competence-based qualifications, including apprenticeships, are fundamental to ensuring that installation and maintenance work delivers fire and electrical safety. Without this essential foundation, the residents of high-rise buildings and hospitals will remain at risk.”
ECA has also warned against the reliance, notably in the domestic consumer market, on short, classroom-based, courses which are being marketed as offering a fast track into competence.
Mike Smith added: “These short courses seriously undermine the take up of apprenticeships in the industry. Furthermore, their continued existence undermines calls from Dame Judith Hackitt and the government to ensure that the public is properly protected from fire risks in high rise buildings.”
[edit] About this article
This article was written by Omar Khalil, Communications Manager, ECA. It was published in August 2019 on the website of the Electrical Contractors’ Association (ECA) and can be accessed here.
[edit] Related articles on Designing Buildings Wiki
- Articles about electricity.
- Consumer electronics.
- Consumer unit.
- ECA articles.
- Electrical appliance.
- Electrical consumption.
- Electrical energy.
- Electrical equipment.
- Electrical installation.
- Electrical power.
- Electrical safety.
- Electrical system.
- Electrical wiring.
- Electrician.
- Electricity bill.
--ECA
Featured articles and news
Edmundson Apprentice of the Year award 2026
Entries now open for this Electrical Contractors' Association award.
Traditional blue-grey slate from one of the oldest and largest UK slate quarries down in Cornwall.
There are plenty of sources with the potential to be redeveloped.
Change of use legislation breaths new life into buildings
A run down on Class MA of the General Permitted Development Order.
Solar generation in the historic environment
Success requires understanding each site in detail.
Level 6 Design, Construction and Management BSc
CIOB launches first-ever degree programme to develop the next generation of construction leaders.
Open for business as of April, with its 2026 prospectus and new pipeline of housing schemes.
The operational value of workforce health
Keeping projects moving. Incorporating unplanned absence and the importance of health, in operations.
A carbon case for indigenous slate
UK slate can offer clear embodied carbon advantages.
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.





















Comments
110 volts instead of 240 volts would be a good start. As depicted by the photograph.